LOBA

FactoryBase

Water-based roller primer for cement-based levelling compounds for direct use.

Specifications

  • Packaging: 5 l
  • Drying Time: Earliest possible overcoating after 3 hours up to max. 24 hours.If there are drying delays, wait until completely dry.
  • Application tool: Microfibre 100 - 120 roller (100 - 120 ml/m²) Universal 100 roller (100 - 120 ml/m²)

Documents

FactoryBase

Description

Range of use Suitable for finishing cementitious floor levelling compounds for direct use approved by LOBA. You can find a corresponding list at: www.loba.de/int_en/downloads.

Application The cement-based leveling compound must be prepared for direct use according to the manufacturer's instructions.The floor must be dry and free of any previous layers, oil, grease, wax, silicone or any other impurities. Optimum working conditions: room temperature of +15°C - +25°C, floor temperature of +15°C - +22°C, 40% - 75% relative humidity, material temperature of +18°C - +25°C. Working areas must be adequately ventilated.Transfer material to a LOBA varnish bucket before applying.Stir the material well.To reduce the risk of excessive swelling, we recommend applying a maximum of 2 roll applications per day.Observe general and, if necessary, product-specific occupational health and safety regulations.

Further information can be found in the GISCODE-related operating instructions which are available under www.wingis-online.de.This product is part of the LOBA and Wakol "Connected Systems" for finishing cementitious levelling compounds. The approved combinations can be found at: www.loba.de/int_en/loba-wakol-connected-systemsThinner / MixingThe product is ready for use and must not be reduced!

Application tool / application rateLOBA Roller Microfiber 100-120 / 100-120 ml/m² (8-10 m²/l). LOBA Roller Universal 100 / ca. 100-120 ml/m² (8-10 m²/l).Drying timeEarliest possible overcoating after 3 hours up to max.

24 hours.If there are drying delays, wait until completely dry.Intermediate sandingDo not intermediate-sand the primer.Application:Preparation:Apply suitable cementitious levelling compound for direct use according to the manufacturer's instructions. Do not sand the leveling compound, any inclusions should be partially removed with a sharp blade. Suitable levelling compounds can be found on the list of approved cementitious levelling compounds at: www.loba.de/en/Suitability-list/Factory-Line.

Regard respective technical information of the levelling compound manufacturer. Application:Roll 1x FactoryBase.

Drying time min. 3 hours, only continue working when the surface is visually uniformly dried, maximum 24 hours. Roll 1x 2K FactoryStyle according to the technical information. For further details, please refer to "Levelling compound as a wear surface | Finished".

Care instruction to maintain surface:Detailed recommendations for cleaning and care can be found in the LOBA care instructions. These general and product-specific recommendations can also be found under www.loba.de.Important informationMechanical resistance:Resistant to mild grinding and rolling load. Liquids:A finished system set-up is a system open to diffusion.

Liquids are to be absorbed immediately, as prolonged exposure can lead to discoloration.

If film injuries (scratches, holes, cuts, etc.) occur, liquids can be absorbed unhindered into the filler.

Depending on the inherent color of the levelling compound or the surface coating, contaminations become more visible, e.g. dark coffee stain on light levelling compound.Only step on unfinished levelling compound with shoe covers. Dirt and moisture acting on the levelling compound, may become visible after surface treatment.

Specifications

Application toolMicrofibre 100 - 120 roller (100 - 120 ml/m²) Universal 100 roller (100 - 120 ml/m²)

Documents

Request Information

Fill out the form and we will contact you. or call +371 22 577 712